Overview

John and Tracey were referred to Excellence by our trusted architects, who had been guiding them through the initial design phase. Impressed by our extensive construction experience and glowing client feedback, John & Tracey sought our expertise to provide insight into crucial building decisions and to assist in developing a comprehensive project plan with associated costs.

 

After collaborating with John and Tracey to establish trust and a strong relationship, we were honored to be entrusted with the core aspect of their basement conversion project. This phase would lay the foundation for subsequent work by individual trades as their budget permitted.

 

The project involved significant excavation work, utilizing both machinery and manual labor. The existing basement underwent a complete transformation, with all internal spaces being reconfigured to create a semi open-plan layout. This space would accommodate a Master Bedroom, walk-in wardrobe, relaxation area, and bathroom.

 

To enhance the entrance to the basement, the existing garden stone steps and balcony were dismantled, salvaging as much original stonework as possible. This allowed for the creation of a spacious new entrance and an adjacent seating area. The installation of bi-fold doors added a touch of grandeur, opening up the entire basement entrance and lending the conversion an impressive aesthetic appeal.

 

New stone steps were carefully positioned, and an extensive block and beam floor was laid to create a spacious new balcony area. This area now serves as a seamless connection between the main house, upper lounge, and the outdoors, offering two distinct seating areas from which to appreciate the expansive front garden and its mature landscaping.

REQUEST A QUOTE

Project Overview

  • Extensive excavation involving machine and manual labor.
  • Gutting of existing basement and preparation of internal spaces for semi open-plan layout.
  • Creation of Master Bedroom, walk-in wardrobe, relaxation area, and bathroom.
  • Demolition of existing garden stone steps and balcony, salvaging original stonework where possible.
  • Installation of bi-fold doors for impressive basement entrance.
  • Repositioning of new stone steps and installation of block and beam floor to create a large new balcony area.
  • Connection of main house and upper lounge to the outside, overlooking the front garden.
REQUEST A QUOTE

Project Gallery

CaseStudy___4507___IMG_6653
CaseStudy___4507___IMG_6654
CaseStudy___4507___IMG_6656
CaseStudy___4507___initial access into basement
CaseStudy___4507___more framing shots of b&B framework
CaseStudy___4507___more sel b&B floor
CaseStudy___4507___Pano Shots
CaseStudy___4507___Pano Shots 2
CaseStudy___4507___Pano Shots 3
CaseStudy___4507___Pano Shots 4
CaseStudy___4507___Pano Shots 5
CaseStudy___4507___Pano Shots 6
CaseStudy___4507___Pano Shots 7
CaseStudy___4507___Pano Shots Chris Site Admin
CaseStudy___4507___Pano Shots clients
CaseStudy___4507___Pano Shots peek a boo
CaseStudy___4507___Pano Shots Sel sat down
CaseStudy___4507___Pre Project Picture internal
CaseStudy___4507___Pre Project Picture internal2
CaseStudy___4507___Pre Project Picture internal3
CaseStudy___4507___Pre Project Picture internal4
CaseStudy___4507___Pre Project Picture internal5
CaseStudy___4507___Pre Project Picture internal6
CaseStudy___4507___Pre Project Picture
CaseStudy___4507___Pre Project Picture2
CaseStudy___4507___Pre Project Picture3
CaseStudy___4507___sel & chris kango drill
CaseStudy___4507___sel & dean concrete pump
CaseStudy___4507___sel block & beam
CaseStudy___4507___sel laying concrete floor
CaseStudy___4507___sel steel frame for block & beam
CaseStudy___4507___sel walking B&B frame
CaseStudy___4507___start of project floor area
CaseStudy___4507___terrace area
CaseStudy___4507___terrace frame for block & beam
CaseStudy___4507___concrete lintel
CaseStudy___4507___demolish old steps
CaseStudy___4507___Digging foundations
CaseStudy___4507___digging out basement floor
CaseStudy___4507___external screed dean
CaseStudy___4507___groundworker 2
CaseStudy___4507___groundworker
CaseStudy___4507___IMG_6645
CaseStudy___4507___IMG_6646
CaseStudy___4507___IMG_6647
CaseStudy___4507___IMG_6648
CaseStudy___4507___IMG_6649
CaseStudy___4507___IMG_6650
CaseStudy___4507___IMG_6651
CaseStudy___4507___IMG_6652
CaseStudy___4507___block & beam
CaseStudy___4507___branding basement shot
CaseStudy___4507___chris block work
CaseStudy___4507___Chris breaking through external basement wall
CaseStudy___4507___chris installing DPM
CaseStudy___4507___clean & tidy always
CaseStudy___4507___clearing old ready for new
CaseStudy___4507___client and sel inspecting new terrace floor
previous arrowprevious arrow
next arrownext arrow
Shadow